Why is PTA Surveillance of Injection wells useful?
by Bill Roberts, President, OPC USA The benefits of pressure transient analysis (PTA) for production wells is widely recognised. However, the need to undertake PTA on water injection wells can sometimes be overlooked by operators. Since wellhead pressure and injection rate are very often measured continuously, there is a wealth of data that can be […]